Project Name | General Contractor | Architect | Engineer | Completion Date | New Construction/ Re-Model | Location |
---|---|---|---|---|---|---|
FMC North Campus | D.E. Harvey Builders | Gensler Architects | Wylie & Associates | 2015 Jan | New | Map |
1600 West Loop | Tellepsen | Gensler Architects | Thompson Company | 2017 Nov | New | Map |
Halliburton OB1 & OB2 | D.E. Harvey Builders | Gensler Architects | Wylie & Associates | 2015 Mar | New | Map |
Block 256 | D.E. Harvey Builders | Kendall/Heaton Associates | WSP Flack+Kurtz | 2016 Apr | New | Map |
1500 Post Oak | D.E. Harvey Builders | Kendall/Heaton Associates | I.A. Naman+Associates | 2014 Dec | New | Map |
BHP Buildout | DE Harvey | Gensler Architects | I.A. Naman+Associates | 2017 Feb | New | Map |
BHP Billiton | Ryan Construction | Gensler Architects | CHPA | 2016 Oct | New | Map |
Chicago Bridge & Iron | Balfour Beatty | Ziegler Cooper Architects | DBR Engineering Consultants | 2015 Jan | New | Map |
Shell Woodcreek Phase II | D.E. Harvey Builders | Gensler Architects | I.A. Naman+Associates | 2010 Apr | New | Map |
George R. Brown Garage | Vaughn | WHR | Redding Linden Burr | 2016 Jun | New | Map |
Two Briarlake Plaza | D.E. Harvey Builders | Kirksey Architects | Wylie & Associates | 2015 Jan | New | Map |
NOV Tower | Stone Construction | N/A | N/A | 2016 May | New | Map |
Gulf States Toyota - Carriage Point | Spaw Maxwell | Transystems Corp. | Kerr Greulich | 2008 Nov | New | Map |
Noble Energy Phase I | Balfour Beatty | Kirksey Architects | Wylie & Associates | 2016 Jun | Re-Model | Map |
BBVA Shell Office & Parking Garage | Manhattan Construction | HKS | Blum Consulting Engineers | 2013 Apr | New | Map |
Price Waterhouse Coopers | Turner Construction | Gensler Architects | Leppard Johnson & Associates | 2014 Nov | Re-Model | Map |
Halliburton Shipping & Receiving | DE Harvey | Gensler Architects | Wylie Consulting | 2013 Apr | New | Map |
Eldridge Oaks | D.E. Harvey Builders | Kirksey Architects | DBR Engineering Consultants | 2009 Jul | New | Map |
KBR Downtown Consolidation | D.E. Harvey Builders | English & Associates | Dominion Interests | 2011 Sep | Re-Model | Map |
Energy Center Phase II | Manhattan Construction | Hellmuth, Obata + Kassabaum | Wylie & Associates | 2009 Mar | New | Map |
Richmond Cummings | E. E. Reed | SGD | Trio Electric | 2016 Jul | New | Map |
Halliburton Life Center | D.E. Harvey Builders | Gensler Architects | Wylie & Associates | 2012 Feb | New | Map |
Baker Botts I - III | Balfour Beatty | Gensler Architects | I.A. Naman+Associates | 2013 Aug | Re-Model | Map |
Modec Sofec | Trademark Construction | Gensler Architects | T&D Engineers | 2014 Dec | New | Map |
Lakes of Post Oak Garage | Balfour Beatty | Ziegler Cooper Architects | Wylie & Associates | 2015 Jul | New | Map |
Halliburton - Buildings J1, J2, J4 & K2 | D.E. Harvey Builders | Gensler Architects | Wylie & Associates | 2012 Dec | Re-Model | Map |
Block 298 Wells Fargo Garage | Tellepsen | Gensler Architects | Redding Linden Burr | 2015 Jul | New | Map |
8 West Centre | D.E. Harvey Builders | Powers Brown Architecture | Redding Linden Burr | 2014 Oct | New | Map |
Gulf States Toyota - Candle Ridge Park | Spaw Maxwell | Transystems Corp. | DBR Engineering | 2010 Dec | New | Map |
Kiewit Technology | E. E. Reed | PGAL | Trio Electric | 2015 May | New | Map |
Sugar Land Buildings B, E & F | D.E. Harvey Builders | Ambrose, McEnany and House | DBR Engineering Consultants | 2006 Jun | New | Map |
Sugar Land Streetscape | D.E. Harvey Builders | SLA Studios | DBR Engineering Consultants | 2005 Dec | New | Map |
One Shell Plaza | D.E. Harvey Builders | Ziegler Cooper Architects | I.A. Naman+Associates | 2012 Aug | Re-Model | Map |
Dayton Community Center | Brookstone | RWS | JSE Engineers | 2010 Mar | New | Map |
Parker Drilling | D.E. Harvey Builders | Ziegler Cooper Architects | DG Engineering | 2009 Jun | Re-Model | Map |
Greater Houston Partnership Lv 9 &10 | DE Harvey | Kirksey Architects | Wylie Consulting | 2016 Apr | New | Map |
CBD Fitness | DE Harvey | Kirksey Architects | DBR Engineering | 2013 Jun | Re-Model | Map |
SJRA Administration Building | Brookstone | Ken Anderson & Assoc. | KO Design | 2010 Nov | New | Map |
Schlumberger Levels 1, 16 & 17 | D.E. Harvey Builders | Planning Design Research | Burns DeLatte & McCoy | 2006 Dec | Re-Model | Map |
20 Greenway Plaza | Gallant Builders | Ziegler Cooper Architects | T&D Engineers | 2015 Feb | Re-Model | Map |
2500 City West Blvd. | D.E. Harvey Builders | Ziegler Cooper Architects | I.A. Naman+Associates | 2012 Apr | Re-Model | Map |
4306 Yoakum | Manhattan Construction | Trio Electric | Trio Electric | 2014 Mar | New | Map |
Gulf States Toyota - Essman | Gallant & Spaw Maxwell | Transystems | DBR Engineering & Carter and Burgess | 2013 Aug | Re-Model | Map |
BMC Executive | Gallant | STG Design | I.A. Naman & Associates | 2016 Mar | Re-Model | Map |
Sanders Morris Harris | D.E. Harvey Builders | Gensler Architects | Redding Linden Burr | 2008 May | Re-Model | Map |
New Trails Office Building | D.E. Harvey Builders | Gensler Architects | Trio Electric | 2008 Jun | New | Map |
Nassau Bay Town Square | D.E. Harvey Builders | Hermes Architects | DBR Engineering Consultants | 2010 Sep | New | Map |
UHY | E. E. Reed | PBK Architects | Wylie & Associates | 2012 Dec | Re-Model | Map |
Swift Energy | Spaw Maxwell | Gensler Architects | Burns DeLatte & McCoy | 2006 Sep | Re-Model | Map |
Worley Parsons | DE Harvey | Kirksey Architects | DBR Engineering Consultants | 2007 Jan | Re-Model | Map |
21 Waterway Avenue | D.E. Harvey Builders | Gensler Architects | DBR Engineering Consultants | 2006 Jul | New | Map |
Jacobs Engineering | Spaw Maxwell | Jacobs Engineering | Trio Electric | 2005 Feb | Re-Model | Map |
Nassau Bay City Hall | D.E. Harvey Builders | Griffin Partners | Trio Electric | 2014 Apr | New | Map |
Park Laureate Levels 1-7 | Gallant Builders | Ziegler Cooper Architects | Redding Linden Burr | 2013 Apr | Re-Model | Map |
Aim Investments Levels 17 & 18 | D.E. Harvey Builders | Planning Design Research | I.A. Naman+Associates | 2008 Dec | Re-Model | Map |
Black Forest Park | D.E. Harvey Builders | Kirksey Architects | Trio Electric | 2010 May | New | Map |
Direct Energy | Byrd Int | Gensler Architects | E/B/E Engineering | 2011 Aug | New | Map |
Sabic Buildback | Gallant | Kirksey Architects | I.A. Naman & Associates | 2016 Jul | Re-Model | Map |
Sheehy, Ware & Pappas | Trademark Construction | Planning Design Research | Wylie & Associates | 2010 Jul | Re-Model | Map |
Sutherland AsBill & Brennan | Spaw Maxwell | Perkins and Will | Redding Linden Burr | 2010 Jun | Re-Model | Map |
Enterprise Products Addition | Gallant Builders | Ziegler Cooper Architects | I.A. Naman+Associates | 2011 Nov | New | Map |
Statoil Hydro Levels 15, 16 & 17 | D.E. Harvey Builders | Planning Design Research | I.A. Naman+Associates | 2011 May | Re-Model | Map |
KBR - Eldridge Oaks - Level 3 | D.E. Harvey Builders | English & Associates | Dominion Interest | 2011 Oct | New | Map |
Campanile Office Building | Mission Constructors | Philip Ewald Architects | Trio Electric | 2007 Jun | New | Map |
Schlumberger | D.E. Harvey Builders | PDR Corporation | Burns, Delatte | 2014 Jan | Re-Model | Map |
Regions Bank | EE Reed | Staffelbach | Schmist & Stacy | 2016 Aug | New | Map |
Halliburton North Belt South Garage | D.E. Harvey Builders | Gensler Architects | Wylie & Associates | 2011 Jan | New | Map |
RPC, Inc. | DE Harvey | Inventure Design | DBR Engineering | 2012 Apr | Re-Model | Map |
Halliburton - Building J, Level 3 | D.E. Harvey Builders | English & Associates | DBR Engineering Consultants | 2009 Jan | Re-Model | Map |
Brock Group | Spaw Maxwell | Gensler Architects | Redding Linden Burr | 2009 Feb | Re-Model | Map |
Kinder Morgan Levels 6 & 7 | Spaw Maxwell | Planning Design Research | E/B/E | 2008 Jun | Re-Model | Map |
NCR | Blackfor | N/A | Trio Electric | 2010 Dec | Re-Model | Map |
Colt International | Metzger | Powers Brown Architecture | Redding Linden Burr | 2007 May | New | Map |
Seyfarth Shaw Houston | Turner Construction | Rottet Studio | T&D Engineers | 2014 Jan | Re-Model | Map |
MGL | D.E. Harvey Builders | Gensler Architects | Trio Electric | 2008 Aug | Re-Model | Map |
Munsch Hardt Kopf Harr | E. E. Reed | Ziegler Cooper Architects | Wylie Engineers | 2014 Jan | Re-model | Map |
Houston Ed | Spaw Maxwell | Ascension Group | MeinHardt | 2011 Jan | Re-Model | Map |
Halliburton Daycare | D.E. Harvey Builders | Gensler Architects | Wylie & Associates | 2012 Jun | New | Map |
Uptown Pedestrian Mobility | Uptown | SWA Group | Hunt Engineers | 2009 Dec | New | Map |
Nabors, Level 10 | Ryan | N/A | N/A | 2016 Jun | Re-Model | Map |
First City Garage | DE Harvey | Morris Architects | N/A | 2012 Nov | Re-Model | Map |
Hamilton SunStrand | D.E. Harvey Builders | CDI Douglass-Pye | Trio Electric | 2011 Nov | New | Map |
Mitsui | Textron | BDMI | Burns DeLatte & McCoy | 2015 Jun | Re-Model | Map |
Modec Light Replacement | Trademark | Gensler Architects | T&D Engineers | 2014 Dec | New | Map |
Consolidated Graphics | Spaw Maxwell | Burwell Architects | Wylie & Associates | 2008 Oct | Re-Model | Map |
Nabors, Level 11 | Ryan | STG Design | I.A. Naman & Associates | 2016 Jan | Re-Model | Map |
Child Advocates | DE Harvey | Gensler Architects | I.A. Naman & Associates | 2016 Jan | Re-Model | Map |
Newfield Level 11 | Gallant | Abel Design | Aaron Tabares | 2016 Sep | Re-Model | Map |
Stewart Title Generator | Metzger | N/A | CCRD Partners | 2008 Dec | Re-Model | Map |
Skadden, Arps, Slate, Meagher | Spaw Maxwell | Ken R. Harry Associates | I.A. Naman+Associates | 2006 Mar | Re-Model | Map |
Statoil Hydro Levels 7, 10 & 11 | D.E. Harvey Builders | Planning Design Research | I.A. Naman+Associates | 2007 Dec | Re-Model | Map |
Enterprise, Level 18 | Gallant | Enterprise | I.A. Naman & Associates | 2016 Aug | Re-Model | Map |
Liskow & Lewis | Spaw Maxwell | Ken R. Harry Associates | N/A | 2007 Apr | Re-Model | Map |
Newfield Level 10 | Gallant | Gensler Architects | I.A. Naman & Associates | 2016 Aug | Re-Model | Map |
Bagby Parking Garage | D.E. Harvey Builders | SIR, Inc. | Trio Electric | 2011 Mar | New | Map |
NBTS | DE Harvey | CDI Douglass-Pye Architects | Trio Electric & DBR Engineers | 2012 Sep | New | Map |
Direct Energy, Levels 14 , 15 | Byrd Int | AMB Architects | T&D Engineers | 2012 Aug | Re-Model | Map |
Nabors, Level 5 | Ryan | STG Design | I.A. Naman & Associates | 2016 Jan | Re-Model | Map |
Ryder Scott | Hast Construction | Harrell Architects, LP | I.A. Naman & Associates | 2012 Sep | Re-Model | Map |
Lincoln Property Co | LINC-RIC | N/A | N/A | 2012 Oct | Re-Model | Map |
Hedwig Village | Burton Co | N/A | N/A | 2019 Feb | New | Map |
Dominion Workplace | AMTECK | N/A | Kendall/Heaton Assoc | 2018 Dec | New | Map |
HP Interiors | DE Harvey | IA Naman | PDR Corporation | 2018 Sep | New | Map |
Conoco Phillips EC4 Levels 4-22 | DE Harvey | IA Naman | PDR Corporation | 2018 Aug | New | Map |
GE Water & Process Technology | EE Reed | N/A | N/A | 2018 Jun | New | Map |
GST Betterment | Gallant | N/A | N/A | 2018 Mar | Re-Model | Map |
GE Suite 120 T & M | EE Reed | N/A | N/A | 2018 Jan | Re-Model |
Map |
School Projects
Project Name | General Contractor | Architect | Engineer | Completion Date | New Construction/ Re-Model | Location |
---|---|---|---|---|---|---|
Allied Health Building | JE Dunn | Bay Architects | JSE Engineers | 2013 Jun | Re-Model | Map |
Mayde Creek Junior High | Durotech | SHW Group Architects | DBR Engineering Consultants | 2012 Sep | Re-Model | Map |
KIPP Phases A&C / Bldg B&D | Linbec | Gensler Architects | Trio Electric | 2016 July | New | Map |
Byron & Sandra Sadler Health Clinic - Brazosport College | D.E. Harvey Builders | Kirksey Architects | E&C Engineering Consultants | 2011 May | New | Map |
AOS | DE Harvey | Gensler Architects | Shah, Smith & Associates | 2016 Nov | New | Map |
Angleton ISD | Durotech | N/A | N/A | 2009 Sep | Re-Model | Map |
UH Michael J. Cemo Hall | JE Dunn Construction | BNIM | WSP Flack & Kurtz | 2010 Jun | New | Map |
College Park | Marshall Construction Co. | PBK Architects | DBR Engineering Consultants | 2010 Apr | Re-Model | Map |
KIPP - SE Campus | Linbeck | Gensler Architects | Dawson Van Orden | 2016 Jun | Re-Model | Map |
HISD Community Learning Center | Durotech | SHW Group Architects | CMTA Engineering | 2010 Feb | New | Map |
KIPP Northeast Expansion | Linbeck | Gensler Architects | Trio Electric | 2012 Aug | Re-Model | Map |
Houston Baptist Univ. Academic Center Building 2 | Mission Constructors | Houston Baptist University | CHPA | 2008 Aug | New | Map |
San Jac Comm College | JE Dunn Construction | Brooks & Sparks | ACR Engineering | 2012 Sep | New | Map |
AAMA Learning Center | Mission Constructors | Rey de la Reza Architects | Henderson Engineering | 2008 Dec | New | Map |
Conroe ISD Misc. Campus Renov. | Durotech | PBK Architects | PBK Engineering | 2011 Aug | Re-Model | Various Addresses |
HCC Morales Building | Durotech | PBK Architects | HRE Engineers | 2011 Feb | Re-Model | Map |
Alief Montessori School | Durotech | Gingrich Associates Architects | Redding Linden Burr | 2010 Nov | New | Map |
John Paul II Catholic School | Durotech | Ray&Hollington | Redding Linden Burr | 2011 Aug | Re-Model | Map |
Avondale House | Brookstone Construction | Curry Boudreaux Architects | Trio Electric | 2007 Nov | New | Map |
Pope John 23 Catholic School | Tellepsen | Ziegler Cooper Architects | Redding Linden Burr | 2011 Nov | New | Map |
University of Phoenix | O'Donnell/Snider | Carpenter Sellers & Assoc. | Harris Consulting Engineers | 2009 Feb | Re-Model | Map |
Rice Elementary | Marshall | PBK Architects | PBK Engineering | 2010 Nov | Re-Model | Map |
Knox Junior High School | Marshall | PBK Architects | PBK Architects | 2011 Jun | Re-Model | Map |
KIPP - East End Field Imp | KIPP | Gensler Architects | Jones & Carter | 2013 Aug | New | Map |
Alief ISD Site Lighting | Trio Electric | N/A | KME Engineers | 2011 Jul | Re-Model | Map |
UHD | UOFHD | N/A | N/A | 2018 Mar | Re-Model | Map |
MLK ATS | TEXASSOU | N/A | N/A | 2018 Feb | Re-Model | Map |
New Caney Ballfield lts | NEWCANEY | N/A | N/A | 2018 Feb | New | Map |
Retail Projects
Project Name | General Contractor | Architect | Engineer | Completion Date | New Construction/Re-Model | Location |
---|---|---|---|---|---|---|
Hubble & Hudson | D.E. Harvey Builders | Heights Venture Architects | DBR Engineering Consultants | 2008 Nov | New | Map |
Brass Armadillo Phase 1 & II | W&W Construction and Armadillo Marketplace | N/A | Trio Electric | 2006 Aug | Re-Model | Map |
Black Walnut Cafe Memorial | Black Forest Ventures | Ziegler Cooper Architects | DBR Engineering | 2012 Aug | New | Map |
Black Walnut Cafe Cinco Ranch | Black Forest Ventures | Ziegler Cooper Architects | DBR Engineering Consultants | 2011 May | New | Map |
Buy Buy Baby | The Sullivan Corporation | MCG Architecture | McHenry & Associates | 2012 Sep | Re-Model | Map |
T-Mobile | Freese | N/A | N/A | 2012 Nov | Re-Model | various Texas stores |
Residential Projects
Project Name | General Contractor | Architect | Engineer | Completion Date | New Construction/ Re-Model |
Location |
---|---|---|---|---|---|---|
The Independent | Balfour Beatty | Rhode Partners | Garza Bury | 2018 Nov | New | Map |
Market Square | D.E. Harvey Builders | Jackson & Ryan Architects | Redding Linden Burr | 2017 Mar | New | Map |
The Sovereign | JE Dunn Construction | Ziegler Cooper Architects | WSP Flack+Kurtz | 2014 Dec | New | Map |
Wilshire | EE Reed | Kirksey Architects | Thompson Company | 2017 Mar | New | Map |
The River Oaks | GT Leach | EDI Architecture | Dabney Commercial | 2016 Sep | Re-Model | Map |
JW Marriott | GT Leach | Gensler Architects | Trio Electric | 2014 Oct | Re-Model | Map |
717 University Drive | Linbeck Group | Treanor Architects PA | D.G. Engineering | 2013 Jul | New | Map |
Embassy Suites | EE Reed | Mitchell Carlson Stone | Jordan & Skala Engineers | 2017 Jun | New | Map |
Highland Tower | GT Leach | Ziegler Cooper Architects | SEI Engineering | 2010 Nov | New | Map |
Briarglen Condominiums | GT Leach | Ziegler Cooper Architects | DBR Engineering Consultants |
2006 Dec | New | Map |
Colonial Oaks Assisted Living | Spaw Maxwell | Urban Architecture | Murray and Associates | 2007 Jul | New | Map |
Two Waterway Lofts | Texas WA | Ziegler Cooper Architects | Wylie & Associates | 2005 Oct | Re-Model | Map |
Fazio Golf Club | D.E. Harvey Builders | EDI Architecture | DBR Engineering Consultants | 2007 Sep | New | Map |
AMIRA Electrical Design | GT Leach | N/A | N/A | 2012 Feb | New | Map |
Clarewood House | Hermes | N/A | N/A | 2011 Feb | Re-Model | Map |
1600 West Loop | Tellepsen | Gensler | Thompson Company | 2017 Nov | New | Map |
70 Rainey | Flintco | Bury | Page Southerland Page | 2019 Jan | New | Map |
Medical Projects
Project Name | General Contractor | Architect | Engineer | Completion Date | New Construction/ Re-Model | Location |
---|---|---|---|---|---|---|
Kingsland Medical Phase II | Mission Constructors | Ray & Hollington | Carter and Burgess | 2006 Aug | New | Map |
Memorial Hermann Sys Bldg W | DE Harvey | Kirksey Architects | Wylie Consulting Engineers | 2011 Sep | Re-Model | Map |
Memorial City Sys Svcs Tower | DE Harvey | Kirksey Architects | Wylie Consulting Engineers | 2011 Jan | Re-Model | Map |
Methodist Brazos, Level 4 | DE Harvey | WHR | SSR | 2016 Dec | Re-Model | Map |
North Cypress Medical Ctr POB II Levels 5 & 6 | Spaw Maxwell | Yeatts Architecture | Milt McLeod | 2009 Sep | New | Map |
North Cypress Medical Ctr Universal Care Addition | Spaw Maxwell | Davis-Stokes Collaborative | P.C. Architects | 2010 Dec | New | Map |
Brae Valley Surgery Center | Mission Constructors | Third Coast Architects | DBR Engineering Consultants | 2007 Sep | New | Map |
St. Lukes EH Liver Clinic | D.E. Harvey Builders | Kirksey Architects | Smith Seckman Reid | 2012 Apr | Re-Model | Map |
Houston Eye Associates | Byrd Interior Construction | Llewellyn-Davies Sahni | DBR Engineering Consultants | 2009 Apr | Re-Model | Map |
TMH Fondren 6 Lab | Spaw Maxwell | Watkins Hamilton Ross | Smith Seckman Reid | 2005 Dec | Re-Model | Map |
Cyfair Surgical | Spaw Maxwell | Identity Architects | Wylie & Associates | 2009 Jan | Re-Model | Map |
Bellaire Dermatology | Stone | Abel Design | EBE | 2016 Jun | Re-Model | Map |
San Jac Methodist Hospital Radiology Dept | Wilson Architectural | Burns Delatte & McCoy | San Jac Methodist Hospital | 2010 May | Re-Model | Map |
Conroe Regional Medical Center | Balfour Beatty | N/A | N/A | 2015 Feb | Re-Model | Map |
Shenandoah | Benchmar | Rataj-Krueger | TRIO Electric | New | Map | |
ALDC - Sugarland | Benchmar | Rataj-Krueger | TRIO Electric | New | target="_blank" rel="noopener noreferrer">Map | |
Vitas Hospice Care | JE Dunn | N/A | N/A | 2011 Apr | Re-Model | Map |
Industrial Projects
Project Name | General Contractor | Architect | Engineer | Completion Date | New Construction/ Re-Model | Location |
---|---|---|---|---|---|---|
Rooms To Go Distribution Center | Bob Moore Construction | MacGregor Associates | Jordan & Skala Engineers | 2010 Feb | New | Map |
City of Houston R.O.W. Maintenance Buildings | JE Dunn Construction | Natex Corp Architects | Huitt Zollars | 2010 Nov | New | Map |
Gulf States Toyota Secondary Accessory Building | Spaw Maxwell | Transystems Corp. | Kerr Greulich | 2009 May | Re-Model | Map |
Flexsteel Manufacturing | D.E. Harvey Builders | Kirksey Architects | Trio Electric | 2012 Mar | New | Map |
Preferred Freezer | Clay Development | Urban Architecture | Trio Electric | 2008 Jan | New | Map |
Gulf States Toyota | Spaw Maxwell | Transystems Corp. | Kerr Greulich | 2008 Jun | New | Map |
Global Tubing Coating Process Addition | Global Tubing | N/A | Trio Electric | 2014 Sep | New | Map |
Global Tubing Mill Expansion | Global Tubing | N/A | Trio Electric | 2012 Aug | New | Map |
Gulf States Toyota | Spaw Maxwell | Transystems Corp. | Kerr Greulich | 2008 Dec | New | Map |
Owens Corning | Owens Corning | N/A | N/A | 2016 Sep | Re-Model | Map |
Cypresswood Utility District Generator | N/A | N/A | Schrader Engineering | 2008 Jul | New | Map |
Calpine Bay Area Business Park Building 1 | Spaw Maxwell | Planning Design Research | I.A. Naman+Associates | 2010 Nov | New | Map |
Global Tubing Service Addition | Global Tubing | N/A | Trio Electric | 2011 Sep | New | Map |
Halliburton Central Plant | D.E. Harvey Builders | Gensler Architects | Wylie & Associates | 2010 Oct | New | Map |
Anheuser Busch | N/A | N/A | 2016 Sep | Re-Model | Map | |
Longhorn Glass | GEBO | N/A | N/A | 2016 Sep | Re-Model | Map |
Toshiba Controls Plant Exp. | One Point Construction | Chaffin & Associates | Hirsch & Associates | 2008 Nov | New | Map |
Aker BioMarine | Sigala | SNC Lavaline | Jacobs Wyper | 2015 Aug | Re-Model | |
Alcon Labs 1.5 MW Generator | Alcon Labs | N/A | Trio Electric | 2012 Jan | Re-Model | |
DEA Generator | DEA | PDG Architects | Redding LInden Burr | 2012 Jul | Re-Model | |
Halliburton Shipping & Receiving | D.E. Harvey Builders | Gensler Architects | Wylie & Associates | 2012 Dec | New | |
CP Chemical Rebuild | SHERMCO | N/A/ | N/A | 2018 Dec | Re-Model | Map |
Cohen Plant Relocate T & M | COHENIND | N/A | N/A | 2018 Jul | Re-Model | Map |
Energy Projects
Project Name | Architect | Engineer | Completion Date | New Construction/ Re-Model |
---|---|---|---|---|
Klein ISD '05 Energy Conservation Project | SHW Group Architects | Kalmans Marshall | 2005 Nov | Re-Model |
Klein ISD '06 Energy Conservation Project | N/A | Kalmans Marshall | 2006 Aug | Re-Model |
Klein ISD '07 Energy Conservation Project | N/A | Kalmans Marshall | 2007 Aug | Re-Model |
Klein ISD '08 Energy Conservation Project | N/A | Kalmans Marshall | 2008 Aug | Re-Model |
Klein ISD '09 Energy Conservation Project | N/A | Energy Systems Associates | 2010 Dec | Re-Model |
Angleton ISD '09 Energy Conservation Project | PBK Architects | DBR Engineering Consultants | 2009 Oct | Re-Model |
Klein ISD '11 Energy Conservation Project | N/A | Energy Systems Associates | 2011 Aug | Re-Model |
Klein ISD Cafeteria Retrofit | N/A | Trio Electric | 2009 Dec | Re-Model |
Fort Bend ISD | N/A | N/A | 2012 Aug | Re-Model |
Alcon Labs Retrofit | N/A | Trio Electric | 2012 Jan | Re-Model |
Garden Ridge Pottery (7 States) | N/A | Trio Electric | 2009 Sep | Re-Model |
Alief ISD - Energy Conservation Project Phase I | N/A | Trio Electric | 2010 Feb | Re-Model |
Alief ISD - Energy Conservation Project Phase II | N/A | Trio Electric | 2011 Apr | Re-Model |
Amegy Bank Garage Retrofit | N/A | Trio Electric | 2010 Jun | Re-Model |
Amegy Bank Rosenberg Retrofit | N/A | Trio Electric | 2010 Dec | Re-Model |
Brochsteins Retrofit | N/A | Trio Electric | 2008 Dec | Re-Model |
Capital One Parking Garage Retrofit | N/A | Trio Electric | 2010 Jul | Re-Model |
Commercial Mountain Graphics Lighting Retrofit | N/A | Trio Electric | 2013 Apr | Re-Model |
Dinerstein Office Building & Garage Retrofit | N/A | Trio Electric | 2009 Nov | Re-Model |
Eldridge Oaks Emon Meters | Kirksey Architects | Trio Electric | 2012 Dec | Re-Model |
EPCO Gulfdale Lighting Retrofit | N/A | Trio Electric | 2012 Jul | Re-Model |
First City Tower Parking Garage Retrofit | N/A | Trio Electric | 2012 Sep | Re-Model |
Lone Star Fasteners Retrofit | N/A | Trio Electric | 2009 Sep | Re-Model |
Rice University Parking Garage Retrofit | N/A | Trio Electric | 2011 Dec | Re-Model |
Star Furniture San Antonio Retrofit | N/A | Trio Electric | 2012 Jan | Re-Model |
StarPak Retrofit | N/A | Trio Electric | 2010 Mar | Re-Model |
Texas State Site Lighting Retrofit | N/A | Trio Electric | 2011 Feb | Re-Model |
Data Center Projects
Project Name | General Contractor | Architect | Engineer | Completion Date | New Construction/Re-Model | Location |
---|---|---|---|---|---|---|
EPCO WestPoint Data Center | Burr Comp | Ziegler Cooper | Burr Engineering | 2010 Dec | New | Map |
CGG Veritas Data Center | Lee Tech | Ziegler Cooper | I.A. Naman & Associates | pending | Re-Model | Map |
Cyrus One Lewisville 1B | Cyrus One | Cyrus One | Prichard Consulting | 2009 Mar | Re-Model | Map |
Memorial Hermann SST Data Center, Level 4 | Burr Comp | Burr Engineering | Burr Computer Environments | 2011 May | Re-Model | Map |
TW Telecom | Steed | Evolve Consulting | Evolve Consulting | 2009 Aug | Re-Model | Map |
Cyrus One Houston 5B | Cyrus One | Cyrus One | Prichard Consulting | 2009 Mar | Re-Model | Map |
EPCO Data Center Gates | SpawMaxwell | N/A | N/A | 2011 Jun | Re-Model | Map |
Enterprise Data Center | SpawMaxwell | N/A | N/A | 2011 May | New | Map |